This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| en:integr2_bedienen [2019/09/12 10:58] – dgroezinger | en:integr2_bedienen [2023/04/25 10:59] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 31: | Line 31: | ||
| // This chapter describes use cases for creating new projects from different sources. // | // This chapter describes use cases for creating new projects from different sources. // | ||
| - | |@red: |**Note:** \\ Make sure you are in the EPLAN view that displays the Integrate menu. |@red: | | + | <WRAP info>< |
| ==== 3.2.1 Creating a new project ===== | ==== 3.2.1 Creating a new project ===== | ||
| Line 101: | Line 100: | ||
| Whether you just want to save the project or save the parts list, all these actions are started from the same module dialog. | Whether you just want to save the project or save the parts list, all these actions are started from the same module dialog. | ||
| - | |@red: |**Note:** \\ Select the correct project and make sure you are in the EPLAN view that displays the Integrate menu. |@red: | | + | <WRAP info>< |
| ==== 3.3.1 Save project ==== | ==== 3.3.1 Save project ==== | ||
| Line 187: | Line 186: | ||
| |7. |Optional: If you discover errors in the parts list, click Cancel. In this case, no BOM information and output files are uploaded to Teamcenter. | | |7. |Optional: If you discover errors in the parts list, click Cancel. In this case, no BOM information and output files are uploaded to Teamcenter. | | ||
| - | |@red: |**Note:** \\ Check the entries in the Missing parts tab. These BOM items do not yet exist in Teamcenter and therefore cannot be included in the BOM. |@red: | + | <WRAP info>< |
| **Result** | **Result** | ||
| Line 206: | Line 205: | ||
| // This chapter describes how projects can be downloaded from Teamcenter and opened in EPLAN. // | // This chapter describes how projects can be downloaded from Teamcenter and opened in EPLAN. // | ||
| - | |@red: |**Note:** \\ Make sure you are in the EPLAN view that displays the Integrate menu. |@red: | | + | <WRAP info>< |
| Line 267: | Line 266: | ||
| This chapter describes use cases for the alignment of parts, items and attributes between the library and Teamcenter. | This chapter describes use cases for the alignment of parts, items and attributes between the library and Teamcenter. | ||
| - | |@red: |**Note:** \\ Make sure you are in the EPLAN view that displays the Integrate menu. |@red: | | + | <WRAP info>< |
| How you work with your components in EPLAN and the items in Teamcenter depends on your workflows. | How you work with your components in EPLAN and the items in Teamcenter depends on your workflows. | ||
| Line 308: | Line 307: | ||
| **Procedure** | **Procedure** | ||
| - | + | |< 50em 5% >| | |
| - | |Create a new part in the library. | | + | |1. |Create a new part in the library. | |
| |2. |Select Synchronize Parts in EPLAN Integrate > Synchronize Parts. The module dialog opens. | | |2. |Select Synchronize Parts in EPLAN Integrate > Synchronize Parts. The module dialog opens. | | ||
| |3. |There are two ways to search for the new component. | |3. |There are two ways to search for the new component. | ||
| Line 330: | Line 329: | ||
| Non-linked components and items are available in both systems. | Non-linked components and items are available in both systems. | ||
| + | |< 50em 5% >| | ||
| |1. |Select Synchronize Parts in EPLAN Integrate > Synchronize Parts. The module dialog opens. | | |1. |Select Synchronize Parts in EPLAN Integrate > Synchronize Parts. The module dialog opens. | | ||
| |2. |Search for the new component in two ways. | | |2. |Search for the new component in two ways. | | ||
| Line 352: | Line 351: | ||
| **Procedure** | **Procedure** | ||
| - | + | |< 50em 5% >| | |
| - | 1. search for an already synchronized item in Teamcenter and open its properties. | + | |1. |search for an already synchronized item in Teamcenter and open its properties. |
| - | 2. change some of the common EPLAN attributes. | + | |2. |change some of the common EPLAN attributes. |
| - | 3. select **Integrate > Synchronize Parts** in EPLAN. The module dialog opens. | + | |3. |select **Integrate > Synchronize Parts** in EPLAN. The module dialog opens. |
| - | 4. Enter the item number in the quick search field and press Enter. | + | |4. |Enter the item number in the quick search field and press Enter. |
| - | 5. Select the component in the Overview area. | + | |5. |Select the component in the Overview area. | |
| - | 6. Check the changed attribute values in Teamcenter in the Details area. | + | |6. |Check the changed attribute values in Teamcenter in the Details area. | |
| - | 7. click **Synchronize**. | + | |7. |click **Synchronize**. |
| **Result** | **Result** | ||