This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| en:training_arbeitenstruktur [2020/02/03 15:09] – dgroezinger | en:training_arbeitenstruktur [2023/04/25 10:59] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 61: | Line 61: | ||
| |@red:< | |@red:< | ||
| |@orange:< | |@orange:< | ||
| - | \\ | ||
| ===== 5.2 Introduction to the Structure Manager ===== | ===== 5.2 Introduction to the Structure Manager ===== | ||
| Line 102: | Line 101: | ||
| If you change a component to a new change status, you must update the assembly manually so that the old change status of the component is removed and the new change status is added. | If you change a component to a new change status, you must update the assembly manually so that the old change status of the component is removed and the new change status is added. | ||
| - | //[In the future, FFG will work with imprecise assembly structures]// | + | //(In the future, FFG will work with imprecise assembly structures)// |
| {{ : | {{ : | ||
| Line 114: | Line 113: | ||
| Precise assemblies are helpful in the case of prescribed, so-called revision control, such as in the case of safety-relevant or documentation-obligatory products. | Precise assemblies are helpful in the case of prescribed, so-called revision control, such as in the case of safety-relevant or documentation-obligatory products. | ||
| Changes to approved precision assemblies always result in a revision of the entire assembly. | Changes to approved precision assemblies always result in a revision of the entire assembly. | ||
| - | \\ | ||
| ===== 5.3 Working with the Structure Manager ===== | ===== 5.3 Working with the Structure Manager ===== | ||
| Line 402: | Line 400: | ||
| {{ : | {{ : | ||
| - | To reset the view, press //" | + | To reset the view, press //" |
| {{ : | {{ : | ||